Zum Inhalt springen
Llamar.ai
Menü
Zurück zu den neuen öffentlichen Seiten

Öffentliche Seite

Frinton-on-Sea beach staircase at The Leas is replaced

Quelle

www.bbc.co.uk

Veröffentlicht am Quelle aktualisiert am (Stand: )

Zu Llamar hinzugefügt am Zusammenfassung aktualisiert am

Originalquelle öffnen (wird in einem neuen Tab geöffnet)
A general view of the beach in Frinton-on-Sea. The sand is split by brown wooden groynes and there are wind turbines out at sea in the distance. A small group of people are pictured gathered in the foreground.

Verstehen

Frinton-on-Sea beach staircase replaced for £197,000

Überblick

A new galvanised steel staircase costing £197,000 has been installed at Frinton-on-Sea in Essex, replacing a previous set of steps that became misaligned due to cliff movement.

Wichtige Punkte

  • The previous staircase at The Leas became crooked because of movement within the cliff.
  • The replacement galvanised steel structure cost £197,000 and can be adjusted for future landscape changes.
  • Work on the project began in April and provides improved access to the coastline.
  • Similar staircase replacement work at Southcliff in Walton-on-the-Naze is expected to finish by the end of 2026.
Diese Seite melden