Verstehen
Albert Bridge closure causing gridlock, residents say in open letter
Überblick
More than 1,100 people have signed an open letter calling for the swift repair and reopening of Albert Bridge in west London, stating that its closure to vehicles since February has caused severe gridlock and impacted local quality of life. The bridge, owned by Kensington and Chelsea Council, was closed after a crack was found and may remain shut until 2027 for repairs costing up to £8.5m. While residents and local letter signatories demand urgent coordinated action from authorities, debate continues over funding responsibilities between the borough council, Transport for London, and the mayor.
Wichtige Punkte
- More than 1,100 people signed an open letter calling for Albert Bridge to be fixed and reopened promptly.
- The west London bridge has been closed to motor vehicles since February following the discovery of a crack in a cast iron component.
- Kensington and Chelsea Council stated the bridge could remain closed to vehicles until 2027 with repair costs reaching up to £8.5m.
- Residents in Chelsea and Battersea report that journeys take 40-50% longer and bus services have become unreliable.
- The mayor of London stated that responsibility for renewing and funding upgrades lies with the borough as the bridge's owner.
