Verstehen
Damaged pedestrian crossings on Douglas Promenade to be replaced
Überblick
Damaged pedestrian crossings on Loch Promenade in Douglas are scheduled to be replaced starting 19 October. The Department of Infrastructure stated that block paving has sunk and bricks have been damaged, prompting the repairs on safety grounds. Work is expected to take two weeks, with asphalt temporarily used before granite replacements are installed.
Wichtige Punkte
- Work on crossings near Victoria Street and Regent Street begins on 19 October and will take approximately two weeks.
- The Department of Infrastructure stated the repairs are being carried out solely on safety grounds due to sunk paving and damaged bricks.
- Asphalt will be used as a temporary safety measure until the crossings are permanently replaced with granite.
- During the first week, the Victoria Street crossing will be repaired under temporary traffic lights while the Regent Street crossing is closed.
- In the second week, the crossing opposite Villiers Square and the Regent Street crossing will be repaired.
- Other worn crossings on the promenade will also be patched with asphalt over the coming months.
